LBRY Block Explorer

LBRY Claims • house-construction-part-21

3b10fe7ba400f439430089cf025a105363859cd5

Published By
Anonymous
Created On
27 Nov 2021 04:52:38 UTC
Transaction ID
Cost
Safe for Work
Free
Yes
House Construction Part 21
The ceilings on the ground floor have their base layer of material and will get the finish layer later. The fence is progressing well and is almost half done. Some of the peripherals are being worked on, such as the dirty kitchen, storage room, and lanai. Catch basins for the downspouts are being added and will be connected with pipes to the cistern.<br />...<br /><a href="https://www.youtube.com/watch?v=reR8KVXh5vA" target="_blank" rel="nofollow">https://www.youtube.com/watch?v=reR8KVXh5vA</a>
Author
Content Type
Unspecified
video/mp4
Language
English
Open in LBRY